Wasl Tower
In October 2017, UNStudio and Werner Sobek unveiled their design for a new Dubai skyscraper with what has been described as the 'world's tallest ceramic facade'.
Wasl Tower will be located in an exceptional, central position along Sheikh Zayed Road, the main thoroughfare that connects the Emirates north to south - and directly opposite the world's tallest building, the Burj Khalifa.
The 300 m-high skyscraper is designed with a twisted, asymmetric shape and will be clad in glazed clay tiles that interlace to form sweeping curves. According to the designers, their concept adopts the principle of 'counterpose', a form in classical sculpture which involves one foot taking more weight and the shoulders and hips being naturally twisted off-axis.
The facade will be illuminated at night in a programmed rhythm, giving the impression that the building is breathing. Developed by Arup, the lights will be positioned behind the fin-shaped tiles and will be powered through solar panels installed on the roof of a nearby car park. The carefully-angled tiles will also provide shade whilst allowing natural light to filter into the building.
The mixed-use building will be operated by hotel group Mandarin Oriental and, in addition to a hotel, will contain offices, private apartments, and public spaces. An open seam will run the full height of the tower, forming a 'vertical boulevard' of stacked outdoor balconies and greenery, with an infinity pool at the top.
Construction began in 2016, and is scheduled to complete in 2020.
Content and images courtesy of UNStudio.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
CIOB launches global mental health survey
To address the silent mental health crisis in construction.
New categories in sustainability, health and safety, and emerging talent.
Key takeaways from the BSRIA Briefing 2024
Not just waiting for Net Zero, but driving it.
The ISO answer to what is a digital twin
Talking about digital twins in a more consistent manner.
Top tips and risks to look out for.
New Code of Practice for fire and escape door hardware
Published by GAI and DHF.
Retrofit of Buildings, a CIOB Technical Publication
Pertinent technical issues, retrofit measures and the roles involved.
New alliance will tackle skills shortage in greater Manchester
The pioneering Electrotechnical Training and Careers Alliance.
Drone data at the edge: three steps to better AI insights
Offering greater accuracy and quicker access to insights.
From fit-out to higher-risk buildings.
Heritage conservation in Calgary
The triple bottom line.
College of West Anglia apprentice wins SkillELECTRIC gold.
Scottish government launch delivery plan
To strengthen planning and tackle the housing emergency.
How people react in ways which tend to restore their comfort.
Comfort is a crucial missing piece of the puzzle.
ECA launches Recharging Electrical Skills Charter in Wales
Best solutions for the industry and electrical skills in Wales.
New homebuilding skills hub launch and industry response
Working with CITB and NHBC to launch fast track training.